How close to the boundary can a duplex be in Hay?
Hay Council's main plan, Hay Shire Building Line Policy (a council policy, not a DCP), RU5 Village, asks a single storey duplex for these setbacks: front 5m, side 0.9m and rear 0.9m.
In Hay the setbacks for a duplex come from Hay Council's setback policy, which stands in for a development control plan (DCP), unless you build as complying development, which follows state rules instead. This page is a first look: enter your address and the Site Checker opens at the setbacks for your lot, with the duplex first.
NSW addresses only. Free, and no sign up.
What setbacks does Hay Council's main plan set for a duplex?
The table gives Hay Shire Building Line Policy (a council policy, not a DCP), RU5 Village's one and two storey figures and the clause each comes from. The plan covers this land: Land zoned RU5 Village: the town of Hay (with North Hay and South Hay) and the villages of Maude and Booligal.
| Setback | One storey | Two storeys | Where in the plan |
|---|---|---|---|
| Front | 5m | 5m | Building Line Policy (22 March 2016), Setback Requirements, Residential (Zone RU5: Village) |
| Side | 0.9m | 0.9m | Building Line Policy (22 March 2016), Setback Requirements, Residential (Zone RU5: Village) |
| Rear | 0.9m | 0.9m | Building Line Policy (22 March 2016), Setback Requirements, Residential (Zone RU5: Village) |
| Corner block, second street | 3m | 3m | Building Line Policy (22 March 2016), Setback Requirements, Residential (Zone RU5: Village) |
Which DCP applies to my block in Hay?
It depends on where the lot is. Hay Shire Building Line Policy (a council policy, not a DCP), RU5 Village is Hay Council's main plan, and 2 other plans cover a duplex on particular land, such as a precinct, an estate, rural land or a former council area. Many councils have several plans, set by zone, estate, precinct or former council area, so enter your address and the Site Checker picks the plan that covers your lot. The table lists each plan with its one storey figures.
| Plan | Where it applies | Front | Side | Rear | Second street |
|---|---|---|---|---|---|
| Hay Shire Building Line Policy (a council policy, not a DCP), RU1 Primary Production | Land zoned RU1 Primary Production. | 20m | 20m | 20m | not set |
| Hay Shire: no DCP (R2 Low Density Residential) | Land zoned R2 Low Density Residential: the single R2 area on the eastern edge of Hay township (229 Bourke Street and 41 Cemetery Road, about 26 ha). | not set (the council has no DCP): ask the council | not set (the council has no DCP): ask the council | not set (the council has no DCP): ask the council | not set |
What are the complying development setbacks for a duplex?
If you build a duplex with a complying development certificate (CDC), the fast approval a private certifier can issue when a design meets the state's fixed standards, the setbacks come from the state codes, not from the council's DCP, and they depend on the lot's area and width. The table shows the complying development (CDC) figures the Site Checker uses for three example lots: 450m² (15m wide, 30m deep), 600m² (15m wide, 40m deep) and 1,000m² (20m wide, 50m deep). Your own lot's figures are in its report, and Can I use complying development on my block? explains which lots qualify.
| Example lot | Front | Side | Rear | Corner block, second street |
|---|---|---|---|---|
| 450m² (15m wide, 30m deep) | 4.5m | 0.9m (1.5m at two storeys) | 3m (8m at two storeys) | 2m |
| 600m² (15m wide, 40m deep) | 4.5m | 0.9m (1.5m at two storeys) | 3m (8m at two storeys) | 2m |
| 1,000m² (20m wide, 50m deep) | 6.5m | 0.9m (1.5m at two storeys) | 5m (12m at two storeys) | 3m |
What if my block is on a corner?
Hay Shire Building Line Policy (a council policy, not a DCP), RU5 Village sets a separate setback for a duplex from the second street, the side street of a corner block: 3m (Building Line Policy (22 March 2016), Setback Requirements, Residential (Zone RU5: Village)). The complying development figure for the second street is in the CDC table above.
Does a two storey duplex need bigger setbacks?
No. Hay Shire Building Line Policy (a council policy, not a DCP), RU5 Village sets the same figures for a one or two storey duplex. Under complying development, the two storey figures are in the CDC table above.
What else do people ask?
Can Hay Council approve a duplex closer to the boundary?
It can. A development application (DA) is assessed on its merits, so the council can accept less than its plan asks for where a design justifies it, or ask for more. A complying development certificate has no such room: the design meets the code's setbacks or it is not complying development.
Do these setbacks apply to a shed, pool or fence in Hay?
No. Sheds, pergolas, carports, pools, decks and fences follow different rules (exempt development, which needs no approval when it meets them), and these pages do not cover them.
When were the setbacks on this page checked?
We last read Hay Council's plans on 12 November 2026. Each figure names the clause it came from, and each plan links to the council's own document, so you can check it against the current version.
Where does this information come from?
These pages are a first look at the setbacks in each council's published development control plan and in the complying development codes, read from the documents linked on each page. They are not a section 10.7 planning certificate or a design check, and a council plan can change after we read it. Confirm anything you rely on with the council or a certifier before you buy, design or build. Nothing on this page replaces advice from your certifier, engineer, lawyer or your own designer.