How close to the boundary can a duplex be in Bland?

Bland Council's main plan, Bland Shire DCP 2012, R1 General Residential (s 3.2 and Chapter 4), asks a single storey duplex for these setbacks: front 5m, side not set by the DCP: ask the council and rear not set by the DCP: ask the council.

In Bland the setbacks for a duplex come from Bland Council's development control plan (DCP), the council's own rules for the design of homes in its area, unless you build as complying development, which follows state rules instead. This page is a first look: enter your address and the Site Checker opens at the setbacks for your lot, with the duplex first.

Check your address

NSW addresses only. Free, and no sign up.

What setbacks does Bland Council's main plan set for a duplex?

The table gives Bland Shire DCP 2012, R1 General Residential (s 3.2 and Chapter 4)'s one and two storey figures and the clause each comes from. The plan covers this land: Bland LEP 2011 Zone R1 General Residential: six polygons, about 359 ha, all in West Wyalong and Wyalong.

Bland Shire DCP 2012, R1 General Residential (s 3.2 and Chapter 4): setbacks for a duplex
SetbackOne storeyTwo storeysWhere in the plan
Front5m5mBland Shire DCP 2012, s 4.3 (All Residential Zones), PMD2.5 / AMD2.5
Sidenot set by the DCP: ask the council4.09m for upper levelBland Shire DCP 2012, s 4.3 (All Residential Zones), PMD2.5 / AMD2.5
Rearnot set by the DCP: ask the council4.09m for upper levelBland Shire DCP 2012, s 4.3 (All Residential Zones), PMD2.5 / AMD2.5
Corner block, second street3m3mBland Shire DCP 2012, s 4.3 (All Residential Zones), PMD2.5 / AMD2.5

Which DCP applies to my block in Bland?

It depends on where the lot is. Bland Shire DCP 2012, R1 General Residential (s 3.2 and Chapter 4) is Bland Council's main plan, and 4 other plans cover a duplex on particular land, such as a precinct, an estate, rural land or a former council area. Many councils have several plans, set by zone, estate, precinct or former council area, so enter your address and the Site Checker picks the plan that covers your lot. The table lists each plan with its one storey figures.

Other plans in Bland that cover a duplex
PlanWhere it appliesFrontSideRearSecond street
Bland Shire DCP 2012, E1 Local Centre (DCP's B2 zone: s 3.2 and Chapter 4)Bland LEP 2011 Zone E1 Local Centre: four polygons, about 30 ha, the West Wyalong (Main Street) and Wyalong (Neeld Street) town centres.5mnot set by the DCP: ask the councilnot set by the DCP: ask the council3m
Bland Shire DCP 2012, Chapter 8 Village Development (Mirrool, Tallimba and Weethalle)Bland LEP 2011 Zone RU5 Village in Mirrool, Tallimba and Weethalle (five RU5 polygons: Weethalle three (about 34 ha), Tallimba one (about 10 ha), Mirrool one (about 16 ha)).5m1.2m1.2mnot set
Bland Shire DCP 2012, Chapter 8 Village Development (Barmedman and Ungarie)Bland LEP 2011 Zone RU5 Village in Barmedman and Ungarie (four RU5 polygons: Barmedman two (about 39 ha), Ungarie two (about 79 ha)).5m0.9m0.9mnot set
Bland Shire DCP 2012, RU1 Primary Production (s 3.1 Rural Dwellings and Chapter 9)Bland LEP 2011 Zone RU1 Primary Production (about 8,363 km2, most of the Shire).30m150m150m30m

What are the complying development setbacks for a duplex?

If you build a duplex with a complying development certificate (CDC), the fast approval a private certifier can issue when a design meets the state's fixed standards, the setbacks come from the state codes, not from the council's DCP, and they depend on the lot's area and width. The table shows the complying development (CDC) figures the Site Checker uses for three example lots: 450m² (15m wide, 30m deep), 600m² (15m wide, 40m deep) and 1,000m² (20m wide, 50m deep). Your own lot's figures are in its report, and Can I use complying development on my block? explains which lots qualify.

Complying development (CDC) setbacks for a duplex on three example lots
Example lotFrontSideRearCorner block, second street
450m² (15m wide, 30m deep)4.5m0.9m (1.5m at two storeys)3m (8m at two storeys)2m
600m² (15m wide, 40m deep)4.5m0.9m (1.5m at two storeys)3m (8m at two storeys)2m
1,000m² (20m wide, 50m deep)6.5m0.9m (1.5m at two storeys)5m (12m at two storeys)3m

What if my block is on a corner?

Bland Shire DCP 2012, R1 General Residential (s 3.2 and Chapter 4) sets a separate setback for a duplex from the second street, the side street of a corner block: 3m (Bland Shire DCP 2012, s 4.3 (All Residential Zones), PMD2.5 / AMD2.5). The complying development figure for the second street is in the CDC table above.

Does a two storey duplex need bigger setbacks?

Yes, under Bland Shire DCP 2012, R1 General Residential (s 3.2 and Chapter 4): the side setback goes from not set by the DCP: ask the council to 4.09m for upper level; the rear setback goes from not set by the DCP: ask the council to 4.09m for upper level. Under complying development, the two storey figures are in the CDC table above.

What else do people ask?

Can Bland Council approve a duplex closer to the boundary?

It can. A development application (DA) is assessed on its merits, so the council can accept less than its plan asks for where a design justifies it, or ask for more. A complying development certificate has no such room: the design meets the code's setbacks or it is not complying development.

Do these setbacks apply to a shed, pool or fence in Bland?

No. Sheds, pergolas, carports, pools, decks and fences follow different rules (exempt development, which needs no approval when it meets them), and these pages do not cover them.

When were the setbacks on this page checked?

We last read Bland Council's plans on 12 November 2026. Each figure names the clause it came from, and each plan links to the council's own document, so you can check it against the current version.

Where does this information come from?

These pages are a first look at the setbacks in each council's published development control plan and in the complying development codes, read from the documents linked on each page. They are not a section 10.7 planning certificate or a design check, and a council plan can change after we read it. Confirm anything you rely on with the council or a certifier before you buy, design or build. Nothing on this page replaces advice from your certifier, engineer, lawyer or your own designer.